Showing posts with label demonstration plant. Show all posts
Showing posts with label demonstration plant. Show all posts

Monday, March 3, 2014

More rigorous testing upcoming for the bionicfuel mf60 prototype

Since the switch has been turned for the first time in August 2013 starting up the mf60 commercial demonstrator at the premises of SMERAL in Brno the engineers performed endless test runs while improving and fixing numerous design and engineering details.

Simply put, they where doing exactly what a prototype is meant to be used for: trial, error detection and correction... Preparing a rock solid processing core for serial production that is ready for 24/7 hard core operation when it reaches a production site for installation. Most fixes required just from a couple of hours to a day or two. But eventually in early January 2014 careful review of collected test data resulted in the decision to proceed with a major redesign of the vapor off-take from the main reactor vessel, an effort which would interrupt test operations and scheduled demonstrations for several weeks.

SMERAL engineers did a great job in preparing and implementing the revised design in only 3 weeks. The almost finished result can be seen below:

redesigned mf60 reactor unit
The new design results in a significantly lower height, making the reactor more robust and energy efficient. Durability will be further improved by repositioning the microwave units for optimized cooling.

Once all measures are completed, a continuous test run for a minimum of 10 days is scheduled which will be monitored by an independent certification agency.   

Wednesday, November 20, 2013

One month after the bionicfuel mf60d went public...

It's been hectic times for everyone at Bionic ever since the bionicfuel mf60 experienced its world premier at the industry fair at Brno last month. While a demonstration reactor was on exhibition at the booth on the fairgrounds, a fully functional unit was available for demonstrations at the test location within the SMERAL factory premises.



The most impressive stream of high profile and expert visitors has in fact not ended with the fair, where the bionicfuel Technology was honored with a prestigious award "Innovative Product of the Year 2013" delivered by the Industry Minister himself. We experience an unexpected ongoing flood of interest from around the world in a visit to the demonstration plant. The waiting list is so long that any end is simply out of sight...

Innovative Product of the Year 2013 awarded by the Industry Minister
Another outcome of the last few weeks is quite a number of new opportunities for far reaching cooperation and project delivery agreements. We are confident, that we can publish a lot of exciting news over the coming weeks and months. The commercialization of the technology has truly begun.

Friday, August 23, 2013

Bionic µBTL mf60d demonstrator entered test phase

Earlier this week the mf60d commercial demonstrator has been switched on for the first time, a success made possible by the excellent collaboration between Bionic R&D and its prime manufacturer SMERAL s.a. Brno in the Czech Republic.

See this Post by Bionic Laboratories BLG GmbH.

A few weeks of rigorous testing and adjustments have been kicked off. This phase includes a formal certification process by independent experts. Presentations for selected clients will commence afterwards.

Full public announcements can be expected in the first half of October.

Congratulations to everyone working hard to make this a success...

An operational mf60D complete with 2 condensers
and one quencher for the liquid fraction

Wednesday, June 26, 2013

The new Bionic µBTL MF60D entered the assembly phase

It has been some time since we last reported on the latest in Bionic's microfuel development. But finally the new downsized fully functional µBTL MF60D demonstrator announced in February is approaching completion. A moment we all are very excited about.

MF60D assembled without microwave units (CAD)

We are now able to share a couple of quite impressive pictures. Here are all of all the mechanical parts (still without Bionic's microwave technology and electronic control modules) while awaiting assembly.

Bionic microfuel demonstrator MF60D ready for assembly
MF60D (top view) awaiting assembly
The top down view gives an excellent perspective on what the completed assembly will look like from the inside. The rotational reactor vessel itself can be seen at the top left side with condenser parts, piping and supporting equipment positioned to the right of it.

The following picture adds the usual view providing a better understanding for the dimensions and actual size of the modules and the completed assembly. As explained before, the reactor unit and all the peripheral modules will later be installed in several standard size container frames, some stacked in two storey configurations.


 
MF60D awaiting assembly
Final assembly has started at the SMERAL s.r.o. production site in Brno (Czech Republic). Subsequently the microwave and electronic control units built directly at Bionic Laboratories BLG GmbH (Germany) will be added and the completed MF60D reactor unit will be furnished with some basic preprocessing equipment for testing.

Final assembly is under way at the Bionic manufacturerer
SMERAL s.r.o. Brno, Czech Rebulic

After some initial test runs formal certification by the German technical verification agency TUEV will commence. Once finalized we will have a thorough look at a very long waiting list for demonstration visit requests...

The most recent published pictures documenting the MF60D assembly progress can always be found first on the Bionic Laboratories Facebook Page.

Wednesday, February 20, 2013

New Bionic µBTL reactor type announced

Bionic microfuel mf60 core element expecting assembly
Over the last year the Bionic Fuel Group has designed a new small scale MWDP reactor mf60 which is currently under construction at Bionic's manufacturer Smeral Brno a.s. in the Czech Republic. One of the special features of the mf60 design is its capability to house a complete plant in up to 4 standard 40' containers, resulting in completely mobile MWDP processing plants. Combined with the relevant feedstock preparation modules and the necessary oil upgrading functions all MWDP feedstock types can be processed on this mobile platform. On average the unit is able to process 250kg of dry feedstock per hour.

As a reminder, MWDP, Bionic's microwave depolymerization technology economically converts organic materials like biomass, plastic waste, used tires and many more into high value liquid and solid fuels. The process utilizes a zeolite catalyst augmented by the application of modulated microwaves.

Once the core unit is completed it will undergo rigid test processing at the manufacturer's site, first internally and then under audit of a renown certification authority. The formal certification will greatly enhance funding options for several large microfuel projects currently in the pipeline. Selected clients will have the opportunity to see the unit in operation during this phase.

Subsequently the qualification plant will be adapted to fully simulate the process of plastic waste conversion. Extensive test and demonstration runs will be performed in order to fully qualify plastic waste as feedstock for large scale microfuel plants. This activity will form an important step towards a scale up process resulting in a full scale pilot plant to be installed at a waste treatment facility in Germany.

As still another step the equipment will thereafter go back to the manufacturer to get rigged up for the planned 4 container set up including all the auxiliary modules necessary for feedstock preparation and product upgrading. The included CHP does not only make the plant independent from external power supply but is also capable of converting all of the produced oil into electricity thus reducing disposal problems for shorter term demonstration runs. This fully mobile plant will go on tour to visit several of our long term potential clients for extensive on-site test and demonstration runs in preparation for long planned large plant orders.

Surprisingly we have already received a number of requests from clients who show high interest to acquire this size of plant for their own specialty purposes. Clean-up of contaminated soil and biochar production are only 2 of the potential commercial uses for this type of unit. Bionic expects to close a number of orders over the first 6 months of the year.